4×600 TPD Maerz Lime Kiln Project for a Steel Plant

Client Background

Industry: Iron & Steel Metallurgy

Equipment: 4 Maerz parallel-flow regenerative twin-shaft lime kilns (single kiln capacity: 600 TPD)

Material Characteristics: High-activity limestone, fuel sulfur content 0.8%-1.2%

Key Requirements:

Resolve refractory spalling caused by alternating kiln temperatures;

Extend kiln lifespan to 5+ years (original: 3 years);

Reduce kiln shell surface temperature to ≤180°C.

Key Challenges

Extreme Operating Conditions:

Cyclical combustion switching (24-30 times/day) with rapid temperature fluctuations (800°C → 1350°C → 800°C);

Synergistic erosion from fuel sulfur and CO₂ generated by limestone decomposition.

Structural Complexity:

40-meter kiln height requiring gradient material performance across preheating/calcining/cooling zones;

Complex shapes (e.g., arches, discharge gates) complicating installation.

Solutions

1. Material System Design

Kiln ZoneRefractory SolutionTechnical Advantages
Preheating ZoneLow-cement high-strength clay castables (Al₂O₃≥55%)CO₂ resistance, thermal conductivity ≤1.2 W/m·K
Calcining ZoneMagnesia-alumina spinel bricks (MgO≥85%, Al₂O₃ 8-12%)3x sulfur resistance, withstands ≥200 thermal cycles
Cooling ZoneSiC composite wear-resistant castables (SiC≥30%)Mohs hardness ≥8, resistant to clinker impact
Arch/Expansion JointsNano-porous ceramic fiber modules + phosphate sealantsCompensates thermal expansion, minimizes cracks

2. Engineering Innovations

Rapid Repair Technology: In-situ hot repair materials (solidifies in 3 hours), reducing downtime by 70%;

Modular Construction: Prefabricated arch bricks improved installation efficiency by 40%.

Results

MetricBeforeAfterEconomic Value
Calcining Zone Lifespan10 months18 monthsAnnual maintenance savings: RMB 3.2M
Kiln Shell Temperature220-250°C≤165°CReduced heat loss, saving RMB 1.5M/year in coal costs
Unplanned Shutdowns8 times/year2 times/yearIncreased annual output by 21,000 tons
Refractory Energy UseBaseline↓15%Reduced CO₂ emissions by 420 tons/year

Client Feedback

“The solution resolved chronic thermal shock damage in Maerz kilns and ensured continuous production.” – Client’s Equipment Management Director

Related Products